Reedley Power Plant

Reedley, California, United States

Overview

Situated between lush stone fruit orchards in Central California, the Reedley project offsets 100% of a nearby waste water treatment plant’s power usage, creating clean, green energy that fits right into the fruitful landscape that surrounds it.

 

Project Facts

NEXTracker120
TECHNOLOGY
Cupertino Electric
DEVELOPER
Cupertino Electric
EPC
247
TRACKER ROWS
36
MODULES
Pacific Power
FINANCIER

To read the full case study, please fill out the brief form below.

NEXTracker Advantages

Small areas and difficult layouts are no issue with the NEXTracker120’s unlinked rows. Independent rows coupled with our characteristic wide tracking angle directly translate to more space for modules, increasing power capacity in tighter site constraints.

The balanced design of the NEXTracker120 aligns the modules with the drive gear axis, reducing overall wear on the system and requiring less power to operate. These optimizations put more power (and profits) where it is needed most — out of the components and into the hands of developers and system owners.

Key Project Benefits

200
PIERS SAVED
72 hours
LABOR SAVED
2 miles
COPPER SAVED
1700 lbs.
CO2
Minimal site grading  

See how NEXTracker can work for your project