Lancaster B Power Plant

Lancaster, California, United States

Overview

When you install a project with an EPC that has roots back to the 1880s, it’s wise to listen to their feedback. Swinerton saw an opportunity to further leverage the slope tolerances built into NEXTracker’s product features. Our accessible engineering team sprang into action, producing an even more refined product that further minimizes site preparation, maximizes cost savings, and takes full advantage of this site’s 35 acres.

 

Project Facts

NEXTracker120
TECHNOLOGY
S Power
DEVELOPER
Swinerton
EPC
SunEdison
FINANCIER  
247
TRACKER ROWS
19,722
MODULES
35 Acres
SITE SIZE
 

To read the full case study, please fill out the brief form below.

NEXTracker Advantages

With NEXtracker, you get a dedicated team that works closely with all of our customers. Add to that value a superior product with built-in quick construction features and industry-changing unlinked rows, and you get a tracking system that greatly reduces the most costly aspects of installation; material and human labor.

The NEXTracker120’s characteristic independent rows further allow for a flexible project design that leverages the site, significantly expanding the GCR and squeezing even more clean, solar power from the system.

Key Project Benefits

16,252
PIERS SAVED
5,700
LABOR HOURS SAVED
Minimal site grading
140 miles
COPPER WIRE SAVED
71,000 tons
CO2 SAVED PER YEAR
 